Preventive maintenance (PM): from plan to execution

Guides & articles

Preventive maintenance (PM): from plan to execution

Preventive maintenance means servicing equipment before it fails. PM templates, per-asset plans, a due calendar and meter-based PM reduce sudden breakdowns and costs.

Why PM?

Every sudden breakdown brings not only repair costs but also lost production, scrap and pressure on the team. Preventive maintenance lowers the chance of failure through regular servicing.

Four steps to a successful PM programme

  1. PM templates: define the tasks of each service type (lubrication, inspection, filter change…) once.
  2. Per-asset plans: attach templates to assets and set the interval — by date (every 30 days) or by usage (every 500 hours or 10,000 km).
  3. Calendar and overdue list: see due dates on a calendar and keep overdue work in view every day.
  4. Execution, approval and history: technicians follow a checklist, supervisors approve and the record stays forever.

Measuring execution

The PM compliance report shows what share of the plan was done on time and which assets are falling behind.

Zana CMMS supports every step, plus meter-based PM for vehicles and generators and bulk execution on the phone.

Related productZana CMMS